
Full Property Refurbishment Ealing W5
Complete end-to-end renovation covering every trade from structural works through to final decoration.
- Structural and replastering works
- Full electrical and plumbing fit-out
- Decoration and final finish
The Bearded Property Co delivers full property refurbishments across Ealing, Paddington, Notting Hill, Pinner and the surrounding West London areas. One team, all trades, from strip-out to final decoration. All quotes provided before work begins.
Ealing and the surrounding West London boroughs contain some of the most varied housing stock in the capital. The area spanning Mattock Lane and Ealing Broadway includes Victorian terraces built between 1880 and 1900, Edwardian semis from the early 1900s, and the large inter-war estate housing that spread out along the Western Avenue corridor from the 1930s onward. Each era brings its own challenges: original lime mortar, cast iron soil stacks, single skin party walls, and timber suspended floors that need careful assessment before any structural or wet trade work begins.
In Paddington and Bayswater W2, the housing stock is dominated by stucco-fronted Victorian mansion blocks carved into flats during the 1950s through 1970s. Bathrooms in these conversions were typically inserted into former bedrooms with no original drainage provision, meaning the pipework runs long horizontal distances under floors, creating low-gradient waste runs that block and leak. A refurbishment that does not address the drainage gradient at the same time as fitting the new suite will reproduce the same problem within a few years.
Notting Hill W11 properties are largely mid-Victorian four-storey townhouses, many now split into leasehold flats. Working in these buildings requires Party Wall Act notifications, building management approvals, and careful protection of communal spaces throughout the project. The Bearded Property Co handles all of this as part of the project management.
Every project is managed end to end with a single point of contact, a written programme and a quote agreed before any work starts.

Complete end-to-end renovation covering every trade from structural works through to final decoration.

Full kitchen strip-out and replacement covering new units, worktops, plumbing, electrical and tiling.

New bathrooms, ensuites, shower rooms and wet rooms. Full strip-out and tanking as standard on all pre-1970 properties.

Full HMO refurbishment and compliance upgrades. We manage the full scope including fire doors, emergency lighting and redecoration.

Combi boiler conversions, new radiator systems and full heating upgrades as part of a refurbishment or standalone project.

All finishing trades covered in-house. Skimming, boarding, large format tiling and full redecoration to a consistent standard.
A full refurbishment is not just decoration. In West London properties, a proper refurbishment typically begins with an asbestos survey on pre-1980 buildings, followed by a structural assessment of floors, walls and the roof zone before any strip-out begins. The Bearded Property Co carries out all pre-works assessment and advises you on what is found before committing to a programme.
Once the assessment is complete, the project follows a logical trade sequence. Structural works come first, then first fix electrical and plumbing, then plastering, then second fix, then tiling, then decoration and finally flooring. Attempting to run trades out of sequence is the most common cause of cost overruns on refurbishment projects in London. Our in-house programme management prevents this from the outset.
Every project follows the same clear four-stage process. Nothing starts until you have a written quote and a programme you have agreed to.
Contact us on 020 8050 9389 or WhatsApp. Describe the property and the scope. We will arrange a site visit at a time that works for you.
We attend the property, assess the scope and any hidden issues, and provide a written quote with a programme. No work begins until you approve both.
Our tradespeople arrive on the start date and follow the agreed programme. You have a single point of contact throughout for updates and decisions.
On completion you receive a written handover report, any required certification, and follow-up advice on maintenance.
When a commercial property falls out of repair, the consequences go beyond inconvenience. A failed bathroom in an HMO or student hostel can trigger a licensing review. A kitchen out of service in a food business results in lost trading days. The cost of getting it right the first time is always less than the cost of a second attempt.
The Bearded Property Co completed a full hostel ensuite installation for a property in Holborn, fitting 12 new shower rooms across three floors within a 4-week programme, coordinating access around resident occupancy and managing all building management requirements. For a community centre in Ealing, we installed a full plant room with new incoming services and a pressurised system, replacing original infrastructure that had been in place since the 1960s.
For commercial landlords and managing agents who need ongoing refurbishment capacity, we offer a planned maintenance arrangement covering an agreed schedule of works each year.

Full bathroom upgrade across an 18-room HMO on Westbourne Terrace. New shower pods installed room by room to maintain occupancy, with all waste runs reconfigured to achieve correct fall.
12 new ensuite shower rooms installed across three floors of a student hostel in Holborn. Full partition build, waterproofing, suite installation and tiling completed within a 4-week programme.
Full plant room replacement for a community centre on Uxbridge Road. New pressurised system, incoming services and controls fitted to replace 1960s original infrastructure.

New dedicated gas supply line installed for a franchise restaurant chain in Uxbridge. Full pressure testing, Gas Safe certification and connection to commercial catering equipment completed within 2 days.
A refurbishment that adds rental value is different from one that simply makes a flat presentable. Landlords across Ealing, Harrow and Paddington come to The Bearded Property Co because we understand the relationship between specification and rental yield. We advise on scope before quoting so you invest in the right work for the right market.
For landlords managing multiple properties, we offer a coordinated programme approach, scheduling works across a portfolio to reduce void periods and maintain a consistent finish standard across all units. We work directly with managing agents and can be added to approved contractor lists for insurance work and routine refurbishment programmes.
All works are documented with before and after photographs, a written schedule of works completed and any certification required for insurance or compliance purposes. This documentation is provided as standard with every project.
Some West London properties need more than a standard refurbishment programme. Cast iron soil stack replacement in a Victorian mansion block in Bayswater requires careful sequencing across multiple flats, liaison with the freeholder and temporary drainage provisions. The Bearded Property Co replaced the cast iron soil stack and installed a new ceiling to a residential property in Holborn, completing the full drainage reline and replastering within a single 5-day programme without the resident needing to vacate.
For a student accommodation conversion in Holborn, we installed 8 new ensuite facilities within existing room dimensions, constructing new partition walls, waterproofing, tiling and fitting suites to match the existing building spec. The full programme was completed around term dates to avoid displacing students.
Every image and video below shows real completed work carried out by The Bearded Property Co across Ealing, Paddington, Pinner, Harrow, Notting Hill and Holborn.
Every project is delivered against a written programme with a single point of contact. When we say a project starts on Monday, it starts on Monday.
Three projects that demonstrate this: We completed a full flat refurbishment in Stanwell within a 5-week programme, covering new kitchen, bathroom, full replastering, rewire and decoration. In Pinner HA5, we completed a kitchen and bathroom refurbishment in a 1930s semi, replacing original lead water pipes and upgrading the consumer unit as part of the same visit, finishing the full scope in 9 working days. In Paddington W2, we installed 18 new shower rooms across an HMO on Westbourne Terrace, completing the programme room by room to maintain occupancy, with zero complaints from existing tenants throughout the 6-week project.
The Bearded Property Co. Registered address: 85 Uxbridge Road, Ealing, London, W5 5BW. Email: info@mrplumbsingh.co.uk.
Real reviews from homeowners, landlords and commercial clients across Ealing, Paddington, Pinner and surrounding areas.
"We needed a full flat refurbishment completed before a new tenancy started in three weeks. The Bearded Property Co came to site the same day I called, provided a written quote by the next morning and started work on Monday. Kitchen, bathroom and full redecoration finished in 12 working days. The property was handed back exactly as promised."
"We manage an 18-room HMO in Paddington and needed all the bathrooms brought up to standard before our licence renewal. The team worked room by room so none of our tenants had to move out. Six weeks, zero complaints from residents and the council inspector passed everything first time."
"Our Notting Hill flat needed a full kitchen and bathroom refurbishment. The team identified a failing soil stack during the assessment that we had no idea about. They replaced it as part of the project and we avoided what would have been a very expensive emergency repair mid-tenancy. Honest, thorough and on time."
"Had a full bathroom refurbishment in our 1930s semi in Pinner. They found original lead pipes under the floor and replaced them on the same visit without increasing the overall quote. Tiling is perfect and the written handover report with before and after photos was a professional touch I did not expect."
"We needed a new kitchen and central heating system for a rental property in Stanmore before winter. Both were quoted together and delivered in 8 days. The combi conversion meant we could remove the old hot water cylinder and gain a full airing cupboard. The tenant has been delighted."
"Full house refurbishment in Harrow, 3 bedrooms, 2 bathrooms, new kitchen and full replastering throughout. The project ran over 11 weeks exactly as programmed. Every trade showed up when they were supposed to and the finished result is exceptional. The property is now achieving 15 percent more in rent."
The Bearded Property Co is based at 85 Uxbridge Road, Ealing W5 5BW. Our team are local West London tradespeople, not a franchise operation dispatching contractors from across the M25.
The Bearded Property Co covers every part of West London for full property refurbishment, including Ealing W5, Paddington W2, Notting Hill W11, Bayswater W2, Pinner HA5, Ruislip HA4, Harrow HA1 and HA2, Stanmore HA7, Wembley HA9, and Farringdon EC1. Our engineers can typically be on site in Ealing within 30 minutes of contact and across all West London postcodes the same day for assessments. All postcodes listed are covered directly, with no subcontracted areas. Contact 020 8050 9389 to arrange a same-day or next-day assessment visit.
The Bearded Property Co covers all of the following areas directly. Every postcode listed is served by our own in-house team from our Ealing W5 base.
Answers to the most common questions from homeowners and landlords across Ealing, Paddington, Harrow and surrounding areas.
The timeline depends on the scope of work. A single bathroom refurbishment in an Ealing W5 property typically takes 5 to 10 working days. A full flat refurbishment covering kitchen, bathroom, replastering and decorating usually runs 3 to 6 weeks. A whole house refurbishment with structural work, rewiring and full fit-out can take 8 to 16 weeks. The Bearded Property Co provides a detailed programme at the quotation stage so you know exactly what to expect before any work begins.
The Bearded Property Co manages the full project with qualified tradespeople covering plumbing, heating, electrical, plastering, tiling, carpentry and decorating. For specialist works such as structural engineering or party wall matters, we coordinate with trusted professionals and manage them as part of the programme. You deal with one point of contact throughout, which removes the delays that arise when a homeowner manages multiple separate contractors simultaneously.
West London has a high proportion of Victorian and Edwardian properties, particularly in Ealing W5, Notting Hill W11 and Bayswater W2. These buildings typically have original cast iron drainage, single skin brickwork and timber floor structures that need careful assessment before any refurbishment begins. Many properties in Paddington and Bayswater are former mansion block conversions where bathrooms were added retrospectively, often with inadequate ventilation and pipework that is now failing.
In most cases it is not practical to carry out a full refurbishment with tenants in residence. For room-by-room or phased works in an HMO, it is possible to sequence the programme so that disruption is contained to one area at a time. The Bearded Property Co works with landlords to plan the programme around void periods, keeping lost rental income to a minimum and the project on schedule.
Properties in Notting Hill W11 and Bayswater W2 frequently require Listed Building Consent or sit within Conservation Areas. Paddington W2 has a high concentration of mansion blocks where building management approval is needed before any external or structural work begins. Ealing W5 and Pinner HA5 properties built in the 1930s often have original lead water supply pipes and single-glazed steel frame windows that need replacing as part of the overall refurbishment scope.
Most internal refurbishment works do not require planning permission and fall under permitted development rights. If you are extending the property, altering the roofline, changing the facade within a Conservation Area, or the property is Listed, planning consent will be needed. Building Regulations approval is required for structural alterations, electrical rewiring, new bathrooms or drainage modifications. The Bearded Property Co advises on all required approvals at the assessment stage.
If you have recently purchased the property or have not had a structural survey in the last five years, commission one before committing to a refurbishment budget. A structural survey will identify hidden defects such as subsidence, damp ingress or failing lintels that need addressing before cosmetic works begin. Starting a refurbishment without this information can result in significant cost increases mid-project. The Bearded Property Co can coordinate a survey as part of the pre-project assessment.
In a leasehold property, responsibility for shared drainage typically sits with the freeholder or managing agent under the terms of the lease. Internal pipework serving only your flat is generally the leaseholder's responsibility. If a refurbishment involves altering bathroom or kitchen drainage, you will usually need written consent from the freeholder before works begin. The Bearded Property Co reviews lease requirements at the assessment stage to ensure the project is properly authorised.
Recurring bathroom problems in Victorian and Edwardian flats are almost always caused by inadequate original waterproofing combined with degraded cast iron or lead pipework. Water penetrates through failed grout and tile adhesive into the substrate, and once the floor structure or walls are saturated, mould growth and ceiling damage to the flat below follow. A surface-only refurbishment that does not strip back to the substrate and apply a proper tanking system will reproduce the same failure within 3 to 5 years.
Yes. The Bearded Property Co manages all neighbour notifications, Party Wall Agreement requirements and site protection where applicable. Working hours are kept within local authority guidelines, typically 8am to 6pm Monday to Friday and 8am to 1pm on Saturdays. In mansion block conversions in Paddington and Bayswater, we liaise directly with building management to agree lift protection, contractor sign-in procedures and waste removal routes in advance.
The Bearded Property Co covers all West London postcodes. All quotes are provided following a no-obligation site assessment. Call now or send a message via WhatsApp.
The Bearded Property Co provides written quotes before work begins, uses local engineers based in Ealing W5, and is available 7 days a week including Bank Holidays.
View us on Google Business Profile →
The Bearded Property Co. 85 Uxbridge Road, Ealing, London, W5 5BW. Tel: 020 8050 9389. Email: info@mrplumbsingh.co.uk. Covering Ealing, Harrow, Paddington, Notting Hill, Bayswater, Pinner, Ruislip, Stanmore and Farringdon.